
1. Wall ties are removed from the interior and exterior foundation walls.
2. Exterior tie holes, voids, and honeycombs are filled with a 100% rubber
mastic.
3. All spill-out, debris, and water remaining on footer are removed.
4. Rub-R-Wall
is
heated to a temperature of 155°F and spray applied at 3000p.s.i.
5. Rub-R-Wall
is applied in 3-4 simultaneous cross pattern coats to assure a cured
thickness of 40 mils.
| |
|
|
|
|
|
|
|
|
![]() |
|
![]() |
||||||
| |
||||||||
| |
|
|
|
|
||||
![]() |
||||||||
|
||||||||
|
|
||||||||
![]() |
![]() |
Environmentally friendy, will not harm the environment or water supply. |